Two gargantuan towers loom over the Detroit River, part of a $4.4 billion megaproject that will change the game of travelling between Ontario and Michigan.
A decades-long battle to address clogged traffic at busy international borders linking Windsor and Detroit, the Gordie Howe International Bridge project is finally coming together in a colossal effort of cooperation between Canada and the United States.
The long-awaited alternative crossing for the truck-clogged Ambassador Bridge (whether traffic or a far-right protest) and car-gridlocked Detroit-Windsor Tunnel will also fill a missing link in an international trucking route, directly connecting Highway 401 on the Canadian side and I-75 on the U.S. side.
To read the full article, please visit: https://www.blogto.com/travel/2022/10/ontario-record-breaking-cable-stayed-bridge-coming-together-us-border/